Thursday, December 1, 2011

History Of Mulaperiyar Dam





The location of the dam had first been scouted by Captain J. L. Caldwell, Madras Engineers (abbreviated as M.E.) in 1808 to reconnoitre the feasibility of providing water from the Periyar river to Madurai by a tunnel through the mountains. Caldwell discovered that the excavation needed would be in excess of 100 feet in depth and the project was abandoned with the comment in his report as "decidedly chimerical and unworthy of any further regard".
The first attempt at damming the Periyar with an earthen dam in 1850 was given up due to demands for higher wages by the labour citing unhealthy living conditions. The proposal was resubmitted a number of times and in 1862, Captain J. G. Ryves, M.E., carried out a study and submitted proposals in 1867 for another earthwork dam, 62 feet high. The matter was debated by the Madras Government and the matter further delayed by the terrible famine of 1876-77. Finally, in 1882, the construction of the dam was approved and Major John Pennycuick, M.E., placed in charge to prepare a revised project and estimate which was approved in 1884 by his superiors.
In May 1882, the construction of the dam began. As per "The Military Engineer in India" Vol II by Sandes (1935), the dam was constructed from concrete and masonry at a cost of INR 104 lakhs, was 173 feet high and 1241 feet in length along the top and enclosed more than 15 thousand million cubic feet of water. Another source states that the dam was constructed of lime and surki (a mixture of sugar and calcium oxide), and gives a figure of 152 feet height of the full water level of the reservoir, with impounding capacity of 10.56 thousand million cubic feet along-with a total estimated cost of INR 84.71 lakhs.
The dam created a reservoir in a remote gorge of the Periyar river situated 3,000 feet above the sea in dense and malarial jungle, and from the northerly arm of this manmade waterbody, the water flowed first through a deep cutting for about a mile and then through a tunnel, 5704 feet in length and later through another cutting on the other side of the watershed and into a natural ravine and so onto the Vaigai River which has been partly built up for a length of 86 miles, finally discharging 2000 cusecs of water for the arid rain shadow regions of present-day Theni, Madurai District, Sivaganga District and Ramanathapuram districts of Tamil Nadu, then under British rule as part of Madras Province (Sandes, 1935).
The Periyar project, as it was then known, was widely considered well into the 20th Century as "one of the most extraordinary feats of engineering ever performed by man". The greatest challenge was the diversion of the river so that lower portions of the great dam could be built. The temporary embankments and coffer-dams used to restrain the river waters were regularly swept away by floods and rains. An extremely large amount of manual labour was involved and the mortality of the workers from malaria was extremely high. It was claimed that had it not been for "the medicinal effects of the native spirit called arrack, the dam might never have been finished". The construction also involved the use of troops namely, the 1st and 4th battalions of the Madras Pioneers as well as Portuguese carpenters from Cochin who were employed in the construction of the coffer-dams and other structures.